Picture looking west at the Baptist Road InterchangeLooking west at the interchange of 
Baptist Road and I-25. 
Picture of the on-ramp at Baptist Road The on-ramp from Baptist Road to 
northbound I-25. 

Meeting Exhibits:

Dec. 11, 2002

July 23, 2002
Feb. 11, 2002

Project Description
Recent residential growth has resulted in higher than anticipated
traffic volumes.
Traffic volumes at the Baptist Road interchange are especially heavy and
impacted by peak hour traffic volumes which causes further congestion.
Two-lane bridge over I-25 causes bottlenecks during peak hour traffic periods.
Non-signalized Struthers Road intersection contributes to congestion
at the interchange.
Inadequate on- and off-ramps contribute to congestion on the interstate.

 

Project Solutions
Improving safety and capacity for Baptist Road Interchange
Coordinate intersection design.
Modify existing access.
Possible frontage road re-alignment

 

Current Status
Conceptual design phase began spring 2001.
The proposed action has been selected and is being evaluated under
the Environmental Assessment (EA) of I-25.
Schedule for preliminary and final design on hold pending EA.

Last Modified: 06/22/2004