Phase I and II repaving is complete.

Phase I map below.

Project Challenges
High concentration of businesses and homes with
Nevada Avenue access points.
Weather and high traffic volume on Nevada Avenue
had damaged the roadway surface.
High traffic volume on Nevada Avenue generated
noise in residential areas.

Current Status
Construction is complete. 
   
Project Description
Rotomilled existing roadway surfaces and repaved
with two inches of new asphalt from Uintah Street
north to I-25.
Stone Mastic Asphalt (SMA), a different type of
pavement, was used in the residential areas
between Uintah and Lilac Streets to:
Provide a skid resistant surface.
Help reduce traffic noise.
Reduce ruts in the pavement.
Reduce glare.

Project Solutions
Measured noise levels in residential areas to
gauge the performance of SMA over the next 
several years. 
Maintained at least one lane of traffic in each
   direction on Nevada Avenue throughout the
   construction process.
Minimized impact to the community by working in
the residential areas during daylight hours and
working in the commercial areas in the evening,
whenever possible.
Completed the necessary roadway
improvements as quickly and with as little impact
   to the community as possible.
Improved driving conditions.
Kept the community informed of temporary
access issues and construction schedules.