North Nevada Avenue / Rockrimmon Interchange
Preferred Alternative and Displays from the 

August 15, 2000  Open House  4:30 - 7:30 p.m. 
at the Wyndham Hotel, 5580 Tech Center Drive, in Colorado Springs.  
Call Julia Goodhouse at (719) 473-0704 for more information.

Due to detail, images will take from 5 to 39 seconds to download at 56.6 Kbps.

Preferred Alternative
Preferred Alternative
Advantages of the Preferred Alternative
South Intersection Detail
North Intersection Detail
South Intersection Alternative Geometry

Potential Corporate Drive Connection
Interstate 25 Typical Section
Interstate 25 Cross Section
Bridge elevation – I 25 over N. Nevada/Rockrimmon
Bridge Elevation – I 25 over Monument Creek

Eliminated Concepts
Initially Eliminated Alternatives
Eliminated Shortlist Alternative 1B
Eliminated Shortlist Alternative 7B
Eliminated Shortlist Alternative 8A
Eliminated Shortlist Alternative 8B

Miscellaneous Exhibits
Project Location Map
Existing Site Conditions
Interchange Improvement Goals
Project Schedule
Selection Process
Evaluation Criteria
Property Ownership Map

Due to detail, images will take from 5 to 39 seconds to download at 56.6 Kbps.

Traffic Analysis
Level of Service Description
Corsim Description
Current Traffic Peaks
I 25 Congestion Now and Projected
Existing Operations
No-build 2020 Operations
Opening Day (2006) Operations with Preferred Alternative
2020 Operations with Preferred Alternative

Travel Times
Rockrimmon to North Nevada & 
North Nevada Avenue to Rockrimmon

Rockrimmon to Northbound I 25 & 
Southbound I 25 to Rockrimmon

Rockrimmon to Southbound I 25 & 
Northbound I 25 to Rockrimmon


Back to North Nevada/Rockrimmon