Nevada/Rockrimmon
looking north
As part of the I-25 Colorado Springs Design/Build Project, the Nevada/Rockrimmon interchange complex will be reconstructed to include wider bridge structures, a connection between North Nevada Avenue and Corporate Drive, and new ramps with collector-distributor bridges.

The COSMIX Project Web sitehas more information about
the I-25 Design-Build project and the improvements to
Nevada/Rockrimmon. The information below is provided as
background information only.

North Nevada, Rockrimmon, Corporate Center Area.
Corporate Center

Project Description
bullet imageImprove the outdated interchanges and interstate roadway in order to meet
current, higher safety standards.  Specifically, to improve the substandard
access ramps at Rockrimmon Boulevard, Mark Dabling Boulevard and
North Nevada Avenue.

bullet imageDesign an interchange that will help improve traffic flow for both current and
future conditions.  Improvements will be consistent with recommendations
of the Environmental Assessment to address mobility throughout the I-25
Corridor in El Paso County.

bullet imageReduce the number of access points in this segment of the interstate. Too
many closely spaced on- and off-ramps create difficult conditions for
motorists entering and exiting the interstate.

bullet imageImprove local traffic mobility, including a better east-west connection
between North Nevada Avenue and Rockrimmon Boulevard.


Meeting Exhibits

Aug. 15, 2000
March 9, 2000
Nov. 16, 1999

Project Solutions
The new interchange concept includes a plan for local street reconfigurations
in collaboration with the City of Colorado Springs that accommodates local
traffic patterns and improves interchange access.
An interchange concept has been identified that responds to the operational
requirements of the site and the concerns and desires of the Colorado
Department of Transportation (CDOT), the City and the local community.

Preferred
Alternative

Advantages of the
Preferred Alternative

Current Status
bullet image
Project has been selected for the first phase of construction.

bullet imageExhibits from the
Pulpit Rock Noise Wall Public Open House 9-25-02
bullet imageInformation on
The Garden of the Gods Ramp Safety Improvements